Case Study

8 St Georges Terrace

About The Project

8 St Georges Terrace is an eight level (including ground) office building located on arguably the most prestigious street in the Perth CBD. Recently purchased by Quintessential it has gone through a major rerfurbishement by one of Australia's most awarded builders FDC Group.
Project
Architect IA Design
Builder FDC Group
Brief upgrade to ground floor EOT & amenities upgrade to 8 levels
Project Length 6 Weeks
Value $130k
Key Material Suppliers Laminex
Hafele Metlam
Location 108 St Georges Terrace Perth

Cubispec Solution

Cubispec Washroom Solutions were successful in their tender bid and selected to work alongside FDC Group. Manufacturing and installing 40 floating shower & toilet partitions, 22 Cubiloc Z Door Lockers, 13 Cubiloc 3 Door Lockers (all with Keya Tronic Pro locks), drying cabinets, ironing board cabinets and a wide range of accessories including soap dispensers, coat hooks, grab rails & shower seats over a 6 week period. Finishes were manufactured as per specification from the Laminex Range in our manufacturing facility in Perth and installed by our in-house installation team.